Loading…

Current Project


Avron

contemporary apartment

  • Contemporary apartment in a recent building, 90 m2
  • Starting date: November 16, 2020
  • Delivery date: April 30, 2021
  • Project management: Individuals
  • Budget: Confidential
  • Study project: complex study
  • Total restructuring of the existing
  • Redistribution of parts in full
  • Italian bathroom, and bathtub
  • Offices, bookcases & storage integrated by HD
  • Integrated layouts by HD
Current Project


Jardin du Ranelagh

High-end project

  • Old apartment, 162 m2, in 1930 Art Deco building
  • Starting date: July 20, 2020
  • Delivery date: April 04 2021
  • Contracting authority: Individuals
  • Budget: Confidential
  • Study project: Complex study
  • Total restructuring of the existing
  • Partial redistribution of the roomsv
  • Italian bathroom
  • Parental suite with its bathroom and its integrated shower room
  • Corian Kitchen
  • Dressings, bookcases and storage units integrated by HD
  • Integrated layouts by HD
  • Lighting by Studio Italia
  • 1930 Art Deco furniture
Current Project


Montparnasse

old fully renovated

  • Old apartment in Haussmann building, 78 m2
  • Start date: 08 March 2020
  • Delivery date: September 08, 2020
  • Contracting authority: Individuals
  • Budget: Confidential
  • Study project: Complex study
  • Total restructuring of the existing
  • Redistribution of water features
  • Italian bathroom Save
  • Offices, libraries & storage integrated by HD
  • HD integrated layouts
  • ‘Beaune’ finish
Project delivered 31/08/2020 !

See the reception

Current Project

Canal St Martin

studio for rent

  • Start date: February 01, 2020
  • Delivery date: May 11, 2020
  • Project owner: individuals
  • Budget: confidential Surface: 24 M2
  • Study project: summary study
  • Layouts integrated at least by HD
Project delivered 11/05/2020 !

See the reception

Current Project

Avenue de New York

Cabinet of Psychiatry

  • Former law firm, fully redecorated
  • Starting date: 15 September 2019
  • Date of delivery: 15 November 2019
  • Building: privateBudget: confidential
  • Project study: summary study
  • Mobilier LONGHI and MINOTTIE
  • Lightings from CONTARDI
  • Passementerie ‘Arte’
  • Finition FJORD and BEAUNE
  • Integration & storage integrated by HD
  • Contemporary Art HD
Current Project

Notre Dame

old apartment completely redesigned

  • Old apartment, 60 m2
  • Starting date: 20 June 2019
  • Delivery Date: December 20th, 2019
  • Project owner: Individuals
  • Budget: Confidential
  • Study project: Complex study
  • Total restructuring of the existing
  • Redistribution of water features
  • Creation of a custom bar with its clad ironwork cladding
  • Italian shower room PETRA
  • Bathroom all LIVING CERAMIC
  • Built-in storage by HD
  • HD integrated layouts
  • Finish ‘feather’
Current Project

Bastille

Apartment, 50 m2

  • Inception of the works: 01 December 2018
  • Date of delivery: 15 March 2019
  • Contracting owner: Private
  • Budget: Confidential
  • Project design: Simple Study/ Advise Pack
  • Creation of a dining kitchen wood, sluggish blue and glass with moiré effect
  • Makeover of the show
  • Integration of an office room with custom storage
  • Furniture by HD
  • Arrangements and libraries integrated by HD
  • 'Feather' and 'Midnight-blue' finish
Project delivered 11/04/2019 !

See the reception

Current Project

Château de Vincennes

Architect House, 200 m2 + extensions

  • Inception of the works: 05 Avril 2018
  • Date of delivery: 05 Janvier 2019
  • Contracting owner: Private
  • Budget: Confidential
  • Project design: Complex design/Pack projet
  • 'King size' master suite
  • Creation: floral water room
  • Dinner kitchen all 'Hevea' and 'Cotto d’Este'
  • Trimmings 'Arte'
  • Home lighting 'VIBIA'
  • Arrangements, libraries and walk-in wardrobes integrated by HD
  • Terraces and extensions all 'IPE'
  • Landscaping by Véronique Fontaine
Current Project

Etienne Marcel

Contemporary apartment

  • Contemporary apartment, 30 m2
  • Inception of the works : 25 march2019
  • Date of delivery : 09 September 2019
  • Contracting owner: Private
  • Budget: Confidential
  • Project design: Complex design/Pack projet
  • Total restructuring of the existing
  • Redistribution: bedroom and living room
  • Creation of a fully integrated dining kitchen
  • Italian shower room all ‘Damasco negro’
  • Custom mini canopy
  • Cladding from ‘Kerlite’
  • Built-in storage by RP
  • Integrated fixtures by RP
  • Finish ‘Beaune 166’
Project delivered 09/11/2019 !

See the reception

Current Project

Novotel Tour Eiffel

Bathroom 'Haute couture'

  • Inception of the works: 15 January 2018
  • Date of delivery: 15 March 2018
  • Contracting owner: Private
  • Budget: Confidential
  • Project design: Complex design/Pack projet
  • Haute couture 'by tailor art and Gubi Light
  • Creations: custom niches
  • Washbasin cabinet Xeno Allia
  • Accessories from Foxydry
  • Lighting from 'DECORWALTER'
Project delivered 15/03/2018 !

See the reception

Current Project

Musée du Louvre

6/7 luxury rooms

  • Inception of the works: 15 September 2016
  • Date of delivery: 15 September 2017
  • Contracting owner: Private
  • Budget: Confidential
  • Project design: Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Home automation, home theater and fully integrated relay
  • Integrated air treatment and customized air conditioning
  • Creations: bathroom by Antonio Lupi and bathrooms 'cab'
  • Kitchen all 'Corian'
  • Trimmings 'Arte' and 'Elitis'
  • Lighting home 'OCHRE'
  • Fixtures, libraries and dressing incorporated by RP
  • Contemporary art and furniture by RP
Project delivered 15/09/2017 !

See the reception

Current Project

Republique

contemporary studio apartment

  • Inception of the works: 20 January 2017
  • Date of delivery: 20 March 2017
  • Contracting owner: Private
  • Budget: Confidential
  • Area: 30 M2
  • Project design: Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creation : Living room 'macaron' and mini kitchen
  • Integrated by RP
Project delivered 15/03/2017 !

See the reception

Current Project

Republique,

customized small cab

  • Inception of the works: 01 October 2014
  • Date of delivery: 30 November 2014
  • Contracting owner: Private
  • Budget: Confidential
  • Area: 9 M2
  • Project design: Simple Study/ Advise Pack
  • Engineering: Cabinet GETP
  • Creation : Custom cabin shower
  • Libraries and Dressing room by RP
Project delivered 30/11/2014 !

See the reception

PROJET EN COURS

Place de l'Etoile

3 contemporary rooms


Surface : 65 m2

  • Inception of the works: 08/04/2016
  • Date of delivery: 08/11/2016
  • Contracting owner: Private
  • Budget: Confidential
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: custom closets
  • Kitchen 'Corian' and facades 'Snow White'
  • Italian water rooms , all ' Icon bone white '
  • Trimmings ' ELITIS '
  • Niches custom in reconstituted stone
  • Fixtures, office and storage space built by RP
  • Selections : custom furniture by RP
Project delivered 15/01/2017 !

See the reception

PROJET EN COURS

Bourse

5/6 rooms in a 'Haussmannian' style

  • Inception of the works: 01/04/2016
  • Date of delivery: 31/10/2016
  • Contracting owner: Private
  • Budget: Confidential
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: Fully ' Mineral '
  • Trimmings ARTE
  • Food & stafferie 'mirror'
  • Facilities: Fixtures, office and dressing incorporated by RP
Project delivered 31/10/2016 !

See the reception

Current Project

Avenue Foch

3/4 luxury rooms


Surface area : 105 m2

  • Inception of the works: 15/02/2016
  • Date of delivery: 15/10/2016
  • Contracting owner: Private
  • Budget: Confidential
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Home automation, home cinema and sound relay is fully integrated
  • Creations: sleeps fun by JF : 'when the trees join us in the children's bedroom'
  • Kitchen with dining area in 'Corian' and 'Clay effect smoothed'
  • Italian bathrooms, all 'mosaic Ellitico' and 'Tratti mix Scuro'
  • Trimmings 'Omexco'
  • Fixtures, office and storage space built by RP
  • Selections : Furniture, monochromes, sculptures and contemporary art by RP
Project delivered 15/10/2016 !

See the reception

Current Project

Place des Victoires

art gallery all 'Flamant'

  • Inception of the works: 25 July 2016
  • Date of delivery: 25 August 2016
  • Contracting owner: Professional
  • Budget: Confidentiel
  • Surface: 62 M2
  • Project design : Simple Study/ Advise Pack
  • Finishing : 'Plume', 'Mistral' and 'Midnight blue'
Current Project

Saint honore

3 luxury rooms

  • Inception of the works: 01/01/2016
  • Date of delivery: 15/06/2016
  • Contracting owner: Private
  • Budget: Confidential
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations ' Wall Relief ' natural stone
  • Kitchen all 'Fondovalle'
  • Room double basins and water scenery in 'Afreshi'
  • Fixtures, office and storage space built by RP
Current Project

Madeleine

beautiful studio, 'à la Japonaise'

  • Inception of the works: 15/02/2016
  • Date of delivery: 15/04/016
  • Contracting owner: Private
  • Budget: Confidential
  • Project design : Complex design/Pack projet
  • Engineering: Ponds and custom mini- bar
  • Fixtures, office and storage space built by RP
Current Project

Georges V,

2 Vintage rooms

  • Inception of the works: 15/06/2015
  • Date of delivery: 15/11/2015
  • Contracting owner: Private
  • Budget: Confidential
  • Surface: 39 M2
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: Bed head 'Anguille' by ARTE
  • Kitchen 'burgundy stone '
  • Micro Shower 'Piera Nora Spalzatta'
  • Equipments: Fixtures and dressing incorporated by RP
Current Project

Pere Lachaise,

Library 'Noir de Lune'

  • Inception of the works: 18 October 2015
  • Date of delivery: 09 November 2015
  • Contracting owner: Private
  • Budget: Confidential
  • Surface: 2 M2
  • Project design : Complex design/Pack projet
  • Matt lacquer finish home FLAMINGO
  • Equipement: Incorporated by RP
Current Project

Royal Palace,

Art Studio

  • Inception of the works: 23 June 2015
  • Date of delivery: 23 October 2015
  • Contracting owner: Private
  • Budget: Confidential
  • Surface: 70 M2
  • Project design : Complex design/Pack projet
  • Creations : Concrete plates and glaze by T.DUBOIS
  • Taps : SCARABEO
  • Ceramics whole ' Fondovalle ' by LINEA
  • Lacquers : ' Bleu de toi ' and ' roller '
  • Trimmings : ELITIS
  • Ironwork by CAZEAU
  • Luminaires with OCHRE
  • Equipement: Incorporated by RP
Current Project

Montmartre,

2 rooms 'Like at a hotel'

  • Inception of the works: 15/06/2015
  • Date of delivery: 15/11/2015
  • Contracting owner: Private
  • Budget: Confidential
  • Surface: 27 M2
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: Trimmings ELITIS
  • Custom kitchen all ' Romanza mix'
  • Shower room and custom stone shower room stapled
  • Equipments: Fixtures and dressing incorporated by RP
Project delivered 15/11/2015 !

See the reception

Current Project

Levallois,

Studio 'design'

  • Inception of the works: 20/03/2015
  • Date of delivery: 31/07/2015
  • Contracting owner: Private
  • Budget: Confidential
  • Surface: 24 M2
  • Project design : Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: Custom bathroom all 'Volta Cerrere '
  • Libraries / dressing rooms and fixtures incorporated by 'RP'
Current Project

Louvre,

2/3 rooms in a contemporary stylef

  • Inception of the works: 05/02/2015
  • Date of delivery: 05/05/2015
  • Contracting owner: Private
  • Budget: Confidential
  • Surface: 70 M2
  • Project design: Simple Study/ Advise Pack
  • Creations: bathroom all 'Damasco' furniture: CARNAVERA
  • Taps: ONDYNA
  • Niches: 'Pietre Mora' by LINEA
  • Lacquers: RP
  • Trimmings: ARTE
  • Equipments: Fixtures and dressing incorporated by RP
Project delivered 08/05/2015 !

See the reception

Current Project

MONTPARNASSE,

2 rooms contemporary flat

  • Start date: 20/10/2014
  • Estimated Delivery Date: 20/04/2015
  • Project Ownership: Private
  • Budget: Confidential
  • Surface: 55 M2
  • Project: Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: Washstands 'bijoux' with glass mosaic and nacre
  • Furniture: Bed console custom by RP
  • Equipement: Incorporated by Renovation Parisienne
Project delivered 18/04/2015 !

See the reception

Current Project

Luxembourg,

luxury bathroom spaces

  • Start date: 20/10/2014
  • Estimated Delivery Date: 20/6/2015
  • Project Ownership: Private
  • Budget: Confidential
  • Surface: 43 M2
  • Project: Complex design/Pack projet
  • Engineering: Cabinet GETP
  • Creations: Custom bathroom by Renovation Parisienne
Current Project

BARBES,

2 living spaces

  • Start date: 01/11/2014
  • Estimated Delivery Date: 31/01/2015
  • Project Ownership: Private
  • Budget: Confidential
  • Surface: 42 M2
  • Project: Simple Study/ Advise Pack
  • Finish : 'Staining'
Current Project

Saint Michel,

5/6 rooms in a contemporary style.

  • Inception of the works: 1st of Mai, 2014
  • Date of delivery: 1st of Mai, 2015
  • Contracting owner: Private
  • Budget : Confidential
  • Surface : 166 M2
  • Project design : Complex design/Pack projet
  • Engineering : Cabinet GETP
  • Fully integrated custom built-ins: integrated eating space, custom designed headboards, integrated convertible sleeping spaces
  • Equipment: integrated ventilation system with air-filter
Project delivered 07/05/2015 !

See the reception

Current Project

Abbesses,

3 rooms contemporary flat

  • Start date : 15/06 2014
  • Estimated Delivery Date : 15/12/2014
  • Project Ownership : Private
  • Budget: Confidential
  • Surface Area : 50 m²
  • Project : Detailed Study/Project Pack
  • Engineering : GETP Cabinet
  • Creation : mini bathroom 'mosaic'
  • Equipement : Incorporated by Renovation Parisienne
Project delivered 15/11/2014 !

See the reception

Current Project

Nation,

Minimalist bathroom

  • Start date : 10/06/2014
  • Estimated Delivery Date : 15/07/2014
  • Project Ownership : Private
  • Budget: Confidential
  • Surface Area : 4 m²
  • Project : Simple Study/ Advise Pack
  • Equipements : Vasque COSMIC
  • Façades sur mesure par EGGER
Project delivered 15/07/2014 !

See the reception

Current Project

Rivoli,

2/3 rooms "Like at a hotel".

  • Inception of the works : 15 January 2014
  • Date of delivery : 15 May 2014
  • Contracting owner: Private
  • Budget : Confidential
  • Surface : 37 M2
  • Project design : Simple Study/ Advise Pack
  • Ingineering : Cabinet GETP
Project delivered 15/05/2014 !

See the reception

Current Project

Elysée,

2/3 rooms in prestigious building

  • Start Date: 01/04/2013
  • Estimated Delivery Date: 30/09/2013
  • Project Ownership: Private
  • Budget: Confidential
  • Surface Area: 71m²
  • Project : Detailed study/Project Pack
  • Engineering : GETP Cabinet
  • Participants : 'Staff en Seine'/'Cuir de Taille'
Projet livré le 30 septembre 2013 !
Visualisez la réception
Current Project

Grands Boulevards,

Customized small flat

  • Start Date : 17/04/2013
  • Estimated Delivery Date : 30/06/2013
  • Project Ownership: Private
  • Budget: Confidential
  • Surface Area : 14 m²
  • Project : Simple Study/ Advise Pack
  • Participants : 'Balser' Carpentry
Projet livré le 15 juillet 2013 !
Visualisez la réception

Butte aux Cailles,

1 room contemporary flat

  • Start Date : 08/04/2013
  • Estimated Delivery Date : 31/07/2013
  • Project Ownership: Private
  • Budget: Confidential
  • Surface Area : 38 m²
  • Engineering : GETP Cabinet
  • Project : Detailed Study/Project Pack
  • Participants :
    Lace-Making 'Marie de Biasio' from 'Pierre Frey '
Projet livré le 30 juillet 2013 !
Visualisez la réception
Current Project
Current Project

Canal St-Martin,

1 room flat with luxury finishes

  • Start Date : 01/04/2013
  • Estimated Delivery Date : 15/07/2013
  • Project Ownership : Private
  • Budget : Confidential
  • Surface Area : 37 m²
  • Project : Detailed Study/Project Pack
  • Participants : 'Géraldine Bouix'
    from 'Cole and Papers'
Projet livré le 15 juillet 2013 !
Visualisez la réception

Rambuteau

Open sky terrace

  • Structures et rembardes par Philippe Dard architecte
  • Préagencement des lambourdes
  • Mini spoterie hydrofuge "invisible" en laiton brossé
  • Finition lames brésiliennes Cumaru 150mm