Avron
contemporary apartment
- Contemporary apartment in a recent building, 90 m2
- Starting date: November 16, 2020
- Delivery date: April 30, 2021
- Project management: Individuals
- Budget: Confidential
- Study project: complex study
- Total restructuring of the existing
- Redistribution of parts in full
- Italian bathroom, and bathtub
- Offices, bookcases & storage integrated by HD
- Integrated layouts by HD



Jardin du Ranelagh
High-end project
- Old apartment, 162 m2, in 1930 Art Deco building
- Starting date: July 20, 2020
- Delivery date: April 04 2021
- Contracting authority: Individuals
- Budget: Confidential
- Study project: Complex study
- Total restructuring of the existing
- Partial redistribution of the roomsv
- Italian bathroom
- Parental suite with its bathroom and its integrated shower room
- Corian Kitchen
- Dressings, bookcases and storage units integrated by HD
- Integrated layouts by HD
- Lighting by Studio Italia
- 1930 Art Deco furniture



Montparnasse
old fully renovated
- Old apartment in Haussmann building, 78 m2
- Start date: 08 March 2020
- Delivery date: September 08, 2020
- Contracting authority: Individuals
- Budget: Confidential
- Study project: Complex study
- Total restructuring of the existing
- Redistribution of water features
- Italian bathroom Save
- Offices, libraries & storage integrated by HD
- HD integrated layouts
- ‘Beaune’ finish



Canal St Martin
studio for rent
- Start date: February 01, 2020
- Delivery date: May 11, 2020
- Project owner: individuals
- Budget: confidential Surface: 24 M2
- Study project: summary study
- Layouts integrated at least by HD




Avenue de New York
Cabinet of Psychiatry
- Former law firm, fully redecorated
- Starting date: 15 September 2019
- Date of delivery: 15 November 2019
- Building: privateBudget: confidential
- Project study: summary study
- Mobilier LONGHI and MINOTTIE
- Lightings from CONTARDI
- Passementerie ‘Arte’
- Finition FJORD and BEAUNE
- Integration & storage integrated by HD
- Contemporary Art HD




Notre Dame
old apartment completely redesigned
- Old apartment, 60 m2
- Starting date: 20 June 2019
- Delivery Date: December 20th, 2019
- Project owner: Individuals
- Budget: Confidential
- Study project: Complex study
- Total restructuring of the existing
- Redistribution of water features
- Creation of a custom bar with its clad ironwork cladding
- Italian shower room PETRA
- Bathroom all LIVING CERAMIC
- Built-in storage by HD
- HD integrated layouts
- Finish ‘feather’



Bastille
Apartment, 50 m2
- Inception of the works: 01 December 2018
- Date of delivery: 15 March 2019
- Contracting owner: Private
- Budget: Confidential
- Project design: Simple Study/ Advise Pack
- Creation of a dining kitchen wood, sluggish blue and glass with moiré effect
- Makeover of the show
- Integration of an office room with custom storage
- Furniture by HD
- Arrangements and libraries integrated by HD
- 'Feather' and 'Midnight-blue' finish



Château de Vincennes
Architect House, 200 m2 + extensions
- Inception of the works: 05 Avril 2018
- Date of delivery: 05 Janvier 2019
- Contracting owner: Private
- Budget: Confidential
- Project design: Complex design/Pack projet
- 'King size' master suite
- Creation: floral water room
- Dinner kitchen all 'Hevea' and 'Cotto d’Este'
- Trimmings 'Arte'
- Home lighting 'VIBIA'
- Arrangements, libraries and walk-in wardrobes integrated by HD
- Terraces and extensions all 'IPE'
- Landscaping by Véronique Fontaine



Etienne Marcel
Contemporary apartment
- Contemporary apartment, 30 m2
- Inception of the works : 25 march2019
- Date of delivery : 09 September 2019
- Contracting owner: Private
- Budget: Confidential
- Project design: Complex design/Pack projet
- Total restructuring of the existing
- Redistribution: bedroom and living room
- Creation of a fully integrated dining kitchen
- Italian shower room all ‘Damasco negro’
- Custom mini canopy
- Cladding from ‘Kerlite’
- Built-in storage by RP
- Integrated fixtures by RP
- Finish ‘Beaune 166’



Novotel Tour Eiffel
Bathroom 'Haute couture'
- Inception of the works: 15 January 2018
- Date of delivery: 15 March 2018
- Contracting owner: Private
- Budget: Confidential
- Project design: Complex design/Pack projet
- Haute couture 'by tailor art and Gubi Light
- Creations: custom niches
- Washbasin cabinet Xeno Allia
- Accessories from Foxydry
- Lighting from 'DECORWALTER'



Musée du Louvre
6/7 luxury rooms
- Inception of the works: 15 September 2016
- Date of delivery: 15 September 2017
- Contracting owner: Private
- Budget: Confidential
- Project design: Complex design/Pack projet
- Engineering: Cabinet GETP
- Home automation, home theater and fully integrated relay
- Integrated air treatment and customized air conditioning
- Creations: bathroom by Antonio Lupi and bathrooms 'cab'
- Kitchen all 'Corian'
- Trimmings 'Arte' and 'Elitis'
- Lighting home 'OCHRE'
- Fixtures, libraries and dressing incorporated by RP
- Contemporary art and furniture by RP



Republique
contemporary studio apartment
- Inception of the works: 20 January 2017
- Date of delivery: 20 March 2017
- Contracting owner: Private
- Budget: Confidential
- Area: 30 M2
- Project design: Complex design/Pack projet
- Engineering: Cabinet GETP
- Creation : Living room 'macaron' and mini kitchen
- Integrated by RP




Republique,
customized small cab
- Inception of the works: 01 October 2014
- Date of delivery: 30 November 2014
- Contracting owner: Private
- Budget: Confidential
- Area: 9 M2
- Project design: Simple Study/ Advise Pack
- Engineering: Cabinet GETP
- Creation : Custom cabin shower
- Libraries and Dressing room by RP



Place de l'Etoile
3 contemporary rooms
Surface : 65 m2
- Inception of the works: 08/04/2016
- Date of delivery: 08/11/2016
- Contracting owner: Private
- Budget: Confidential
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: custom closets
- Kitchen 'Corian' and facades 'Snow White'
- Italian water rooms , all ' Icon bone white '
- Trimmings ' ELITIS '
- Niches custom in reconstituted stone
- Fixtures, office and storage space built by RP
- Selections : custom furniture by RP



Bourse
5/6 rooms in a 'Haussmannian' style
- Inception of the works: 01/04/2016
- Date of delivery: 31/10/2016
- Contracting owner: Private
- Budget: Confidential
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: Fully ' Mineral '
- Trimmings ARTE
- Food & stafferie 'mirror'
- Facilities: Fixtures, office and dressing incorporated by RP




Avenue Foch
3/4 luxury rooms
Surface area : 105 m2
- Inception of the works: 15/02/2016
- Date of delivery: 15/10/2016
- Contracting owner: Private
- Budget: Confidential
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Home automation, home cinema and sound relay is fully integrated
- Creations: sleeps fun by JF : 'when the trees join us in the children's bedroom'
- Kitchen with dining area in 'Corian' and 'Clay effect smoothed'
- Italian bathrooms, all 'mosaic Ellitico' and 'Tratti mix Scuro'
- Trimmings 'Omexco'
- Fixtures, office and storage space built by RP
- Selections : Furniture, monochromes, sculptures and contemporary art by RP



Place des Victoires
art gallery all 'Flamant'
- Inception of the works: 25 July 2016
- Date of delivery: 25 August 2016
- Contracting owner: Professional
- Budget: Confidentiel
- Surface: 62 M2
- Project design : Simple Study/ Advise Pack
- Finishing : 'Plume', 'Mistral' and 'Midnight blue'



Saint honore
3 luxury rooms
- Inception of the works: 01/01/2016
- Date of delivery: 15/06/2016
- Contracting owner: Private
- Budget: Confidential
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations ' Wall Relief ' natural stone
- Kitchen all 'Fondovalle'
- Room double basins and water scenery in 'Afreshi'
- Fixtures, office and storage space built by RP



Madeleine
beautiful studio, 'à la Japonaise'
- Inception of the works: 15/02/2016
- Date of delivery: 15/04/016
- Contracting owner: Private
- Budget: Confidential
- Project design : Complex design/Pack projet
- Engineering: Ponds and custom mini- bar
- Fixtures, office and storage space built by RP




Georges V,
2 Vintage rooms
- Inception of the works: 15/06/2015
- Date of delivery: 15/11/2015
- Contracting owner: Private
- Budget: Confidential
- Surface: 39 M2
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: Bed head 'Anguille' by ARTE
- Kitchen 'burgundy stone '
- Micro Shower 'Piera Nora Spalzatta'
- Equipments: Fixtures and dressing incorporated by RP



Pere Lachaise,
Library 'Noir de Lune'
- Inception of the works: 18 October 2015
- Date of delivery: 09 November 2015
- Contracting owner: Private
- Budget: Confidential
- Surface: 2 M2
- Project design : Complex design/Pack projet
- Matt lacquer finish home FLAMINGO
- Equipement: Incorporated by RP




Royal Palace,
Art Studio
- Inception of the works: 23 June 2015
- Date of delivery: 23 October 2015
- Contracting owner: Private
- Budget: Confidential
- Surface: 70 M2
- Project design : Complex design/Pack projet
- Creations : Concrete plates and glaze by T.DUBOIS
- Taps : SCARABEO
- Ceramics whole ' Fondovalle ' by LINEA
- Lacquers : ' Bleu de toi ' and ' roller '
- Trimmings : ELITIS
- Ironwork by CAZEAU
- Luminaires with OCHRE
- Equipement: Incorporated by RP




Montmartre,
2 rooms 'Like at a hotel'
- Inception of the works: 15/06/2015
- Date of delivery: 15/11/2015
- Contracting owner: Private
- Budget: Confidential
- Surface: 27 M2
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: Trimmings ELITIS
- Custom kitchen all ' Romanza mix'
- Shower room and custom stone shower room stapled
- Equipments: Fixtures and dressing incorporated by RP




Levallois,
Studio 'design'
- Inception of the works: 20/03/2015
- Date of delivery: 31/07/2015
- Contracting owner: Private
- Budget: Confidential
- Surface: 24 M2
- Project design : Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: Custom bathroom all 'Volta Cerrere '
- Libraries / dressing rooms and fixtures incorporated by 'RP'




Louvre,
2/3 rooms in a contemporary stylef
- Inception of the works: 05/02/2015
- Date of delivery: 05/05/2015
- Contracting owner: Private
- Budget: Confidential
- Surface: 70 M2
- Project design: Simple Study/ Advise Pack
- Creations: bathroom all 'Damasco' furniture: CARNAVERA
- Taps: ONDYNA
- Niches: 'Pietre Mora' by LINEA
- Lacquers: RP
- Trimmings: ARTE
- Equipments: Fixtures and dressing incorporated by RP




MONTPARNASSE,
2 rooms contemporary flat
- Start date: 20/10/2014
- Estimated Delivery Date: 20/04/2015
- Project Ownership: Private
- Budget: Confidential
- Surface: 55 M2
- Project: Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: Washstands 'bijoux' with glass mosaic and nacre
- Furniture: Bed console custom by RP
- Equipement: Incorporated by Renovation Parisienne




Luxembourg,
luxury bathroom spaces
- Start date: 20/10/2014
- Estimated Delivery Date: 20/6/2015
- Project Ownership: Private
- Budget: Confidential
- Surface: 43 M2
- Project: Complex design/Pack projet
- Engineering: Cabinet GETP
- Creations: Custom bathroom by Renovation Parisienne




BARBES,
2 living spaces
- Start date: 01/11/2014
- Estimated Delivery Date: 31/01/2015
- Project Ownership: Private
- Budget: Confidential
- Surface: 42 M2
- Project: Simple Study/ Advise Pack
- Finish : 'Staining'




Saint Michel,
5/6 rooms in a contemporary style.
- Inception of the works: 1st of Mai, 2014
- Date of delivery: 1st of Mai, 2015
- Contracting owner: Private
- Budget : Confidential
- Surface : 166 M2
- Project design : Complex design/Pack projet
- Engineering : Cabinet GETP
- Fully integrated custom built-ins: integrated eating space, custom designed headboards, integrated convertible sleeping spaces
- Equipment: integrated ventilation system with air-filter




Abbesses,
3 rooms contemporary flat
- Start date : 15/06 2014
- Estimated Delivery Date : 15/12/2014
- Project Ownership : Private
- Budget: Confidential
- Surface Area : 50 m²
- Project : Detailed Study/Project Pack
- Engineering : GETP Cabinet
- Creation : mini bathroom 'mosaic'
- Equipement : Incorporated by Renovation Parisienne



Nation,
Minimalist bathroom
- Start date : 10/06/2014
- Estimated Delivery Date : 15/07/2014
- Project Ownership : Private
- Budget: Confidential
- Surface Area : 4 m²
- Project : Simple Study/ Advise Pack
- Equipements : Vasque COSMIC
- Façades sur mesure par EGGER>




Rivoli,
2/3 rooms "Like at a hotel".
- Inception of the works : 15 January 2014
- Date of delivery : 15 May 2014
- Contracting owner: Private
- Budget : Confidential
- Surface : 37 M2
- Project design : Simple Study/ Advise Pack
- Ingineering : Cabinet GETP






Elysée,
2/3 rooms in prestigious building
- Start Date: 01/04/2013
- Estimated Delivery Date: 30/09/2013
- Project Ownership: Private
- Budget: Confidential
- Surface Area: 71m²
- Project : Detailed study/Project Pack
- Engineering : GETP Cabinet
- Participants : 'Staff en Seine'/'Cuir de Taille'







Grands Boulevards,
Customized small flat
- Start Date : 17/04/2013
- Estimated Delivery Date : 30/06/2013
- Project Ownership: Private
- Budget: Confidential
- Surface Area : 14 m²
- Project : Simple Study/ Advise Pack
- Participants : 'Balser' Carpentry






Butte aux Cailles,
1 room contemporary flat
- Start Date : 08/04/2013
- Estimated Delivery Date : 31/07/2013
- Project Ownership: Private
- Budget: Confidential
- Surface Area : 38 m²
- Engineering : GETP Cabinet
- Project : Detailed Study/Project Pack
- Participants :
Lace-Making 'Marie de Biasio' from 'Pierre Frey '







Canal St-Martin,
1 room flat with luxury finishes
- Start Date : 01/04/2013
- Estimated Delivery Date : 15/07/2013
- Project Ownership : Private
- Budget : Confidential
- Surface Area : 37 m²
- Project : Detailed Study/Project Pack
- Participants : 'Géraldine Bouix'
from 'Cole and Papers'




Rambuteau
Open sky terrace
- Structures et rembardes par Philippe Dard architecte
- Préagencement des lambourdes
- Mini spoterie hydrofuge "invisible" en laiton brossé